For IMACID, a key player in Moroccan industry, we supplied, fabricated and erected a monorail structure on the Jorf Lasfar site.
Project highlights
- Custom study and designAn in-depth needs analysis for a perfect fit with the site and industrial processes.
- MaterialsS235 JR, S275 JR and S355 JR steel, Sa 2½ blasting and zinc-rich epoxy paint.
- Precision fabricationAdvanced methods for a final product that meets the strictest standards.
- Optimised installationEfficient on-site coordination for safe, fast installation.
Despite the project’s constraints, our teams met the deadlines with rigour and professionalism.



