In the Kenitra free zone, we contributed to Dicastal 2, an automotive wheel production plant: study, design and installation of the industrial piping systems.
Project highlights
- In-depth technical studyPrecise analysis of site needs for piping suited to the industrial processes.
- Certified materialsA513 1B and ASTM A513 1A tubes, 304L and 316L stainless steel.
- Precise, safe installationStrict adherence to safety standards and deadlines for efficient commissioning.
- International complianceWork carried out to international industrial piping standards.
Reliable, tailored solutions that support the smooth running of the Dicastal 2 site.



